Deployment · 21-Day Install

Soil infrastructure, installed in 21 days.

Eight stages. Fixed scope. Named operator. Cities, landowners, farms, utilities, and resilience organizations follow the same productized path — from first walk to live operational system.

INSTALL · TIMELINE
Indicative · single site 21 days
01
AssessmentDay 1–3
02
Site mappingDay 3–6
03
Soil data collectionDay 6–10
04
AI model setupDay 10–14
05
Dashboard configurationDay 14–17
06
Reporting workflowsDay 17–19
07
Operator training & handoffDay 19–21
08
Ongoing monitoringDay 21+
The eight stages

Productized install. Fixed scope. Named operator.

Every Sentinel East install follows the same eight stages — adjusted in depth, not in shape, for each operator class.

Stage 01
Day 1–3
01 / 08
Assessment
Workflow inventory, exposure profile, parcel scope, success criteria.
  • Operator interviews
  • Soil-of-record ingestion
  • Climate exposure model
  • Scope-of-work signoff
Stage 02
Day 3–6
02 / 08
Site mapping
Watershed boundaries, parcel topology, sensor placement plan.
  • GIS parcel import
  • Watershed delineation
  • Sensor placement plan
  • Access permissions
Stage 03
Day 6–10
03 / 08
Soil data collection
Baseline soil tests + sensor install across parcels.
  • Lab baseline samples
  • Multi-depth probe install
  • Gateway commissioning
  • Telemetry validation
Stage 04
Day 10–14
04 / 08
AI model setup
Edge model calibration to local soil class, climate band, and operator workflow.
  • Edge model deployment
  • Climate gate config
  • Advisory thresholds
  • Override policy
Stage 05
Day 14–17
05 / 08
Dashboard configuration
Role-scoped views, alert routing, watershed roll-up, council briefings.
  • RBAC setup
  • Alert routing
  • Cohort views
  • Council briefing template
Stage 06
Day 17–19
06 / 08
Reporting workflows
Audit-grade reports for grants, permits, conservation, and council.
  • Grant report templates
  • Permit attachments
  • Conservation export
  • Auto-scheduling
Stage 07
Day 19–21
07 / 08
Operator training & handoff
Named Sentinel East operator transfers operational control to your team.
  • Field ops training
  • Supervisor training
  • Council walkthrough
  • Runbook delivery
Stage 08
Day 21+
08 / 08
Ongoing monitoring
Continuous telemetry, quarterly model recalibration, climate gate revalidation.
  • 24/7 telemetry
  • Quarterly recalibration
  • Annual climate revalidation
  • Named-operator SLA
By operator class

Same eight stages. Different depth.

The install model is identical across operators. The configuration is not.

Cohort + watershed
Municipalities
Watershed-scale rollup, council reporting, climate-grant data of record. Multi-parcel cohort.
Per-field advisory
Farms & growers
Per-field fertility intelligence, irrigation timing, regenerative ROI documentation.
Upstream telemetry
Water utilities
Upstream runoff visibility, nitrate intrusion alerts, source-water protection planning.
Parcel record
Developers & landowners
Pre-build soil-of-record, drainage modeling, post-build stabilization metrics.
Multi-jurisdiction
Resilience agencies
Cross-jurisdiction operations layer with auditable parcel histories.
Outcome verification
Conservation districts
Cohort outcome verification for cost-share programs and grants.
Named operator

You get a person, not a ticket queue.

Every Sentinel East deployment ships with a named install operator who runs every stage, walks every parcel, and stays accountable through a 90-day handover SLA. AI accelerates the work — people own the outcome.

HANDOVER SLA
Stage gate signoffs
Each of 8 stages requires explicit operator + client signoff.
90-day continuity
Named operator stays on-call for 90 days post-handover.
Quarterly recalibration
Edge AI model recalibrated each quarter against new ground truth.
Annual climate revalidation
2030 / 2050 / 2100 viability gate revalidated yearly.
Start a deployment

Bring soil into your operations layer.

A 30-minute strategy call maps your parcels, exposure, and workflows to a 21-day install plan — and a named operator.